Electrical Systems
Accurately controlling the temperature of your beer could be the difference between a World Beer Cup Gold Medal or just another hop-driven pale ale.
Now that you have a shiny new brewing system installed, you’re ready to make beer. Or are you? You still need to run power from the control panel to the numerous pumps, motors, burners, heating coils, and lights, right? We can take care of that for you.
Your fermenters are in place and leveled. Your glycol system is running at 27 degrees. Transfer lines are installed. Your draft system is ready to go. What are you missing? OH YEAH!!! You need to run power from your cellar control panel to your glycol system actuators and install all of the temperature sensors. We can take care of that for you.